1Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Owner’s ManualInstallation and OperationModel: Soho24BDO NOT DISCARD THIS MANUALNOTICE• Leave
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1210Figure 6.3 Minimum Clearances for TerminationONPRQX= AIR SUPPLY INLETA = 12 inches...
11Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Figure 5.2 SLP Pipe Effective LengthFire Hazard.Explosion Risk.Asphyxiation Risk.Do NOT conn
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1212Figure 5.3Figure 5.41. Top Vent - Horizontal TerminationOne ElbowTwo ElbowsV1 Minimum H1 M
13Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Figure 5.51. Top Vent - Horizontal Termination - (continued)Three ElbowsV1 Min. H1 Max. V2
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12142. Top Vent - Vertical TerminationNo ElbowFigure 5.6Figure 5.7Two ElbowsV1 = 45 ft Max. (13
15Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Figure 5.82. Top Vent - Vertical Termination - (continued)Three ElbowsV1 Minimum H1+ H2 Ma
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1216Figure 6.2 Exterior Wall HoleA*B10 in.10 in. * Shows center of vent framing hole for top ven
17Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12C. Vertical Penetration FramingFigure 6.3Figure 6.4 Installing the Attic ShieldA ceiling fi
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1218D. Install Attic Insulation ShieldWARNING! Fire Risk. DO NOT allow loose materials or insula
19Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12CAUTIONSharp Edges• Wear protective gloves and safety glasses during installation.A. Top Ven
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/122CongratulationsListing Label Information/LocationModel Name: _________________________________
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1220Fire Risk.• Follow these instructions exactly.• Facing materials must be installed properly
21Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Figure 7.8 Proper Positioning, Leveling and Securing of a ApplianceC. Securing and Leveling
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12228 8 Installing Vent Pipe A. Assemble Vent SectionsTo attach the fi rst vent component to th
23Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12B. Assemble Slip Sections• Slide the inner fl ue of the slip section into the inner fl ue of
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1224D. Disassemble Vent Sections• Rotate either section (see Figure 8.7) so the seams on both p
25Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12F. Install Metal Roof Flashing• See minimum vent heights for various pitched roofs (Figure 8
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1226SCREWSCAULKSTORM COLLAR(1 of 3)Figure 8.15 TERMINATION CAPH. Install Vertical Termination
27Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Note: When using termination caps with factory-supplied heat shield attached, no additional w
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1228Note: Have the gas supply line installed in accordance with local building codes, if any. If
29Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Fire hazard. Do NOT change the valve settings.• This valve has been preset at the factory.•
3Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12 = Contains updated information.Table of Contents1 Listing and Code Approvals A. Appliance
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1230C. IntelliFire Ignition System WiringThis appliance requires a 110 VAC supply to the applian
31Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12PLUG-IN3V TRANSFORMERON/OFFWALL SWITCHIGNITIONMODULE(3V)VALVENEUTRALGROUNDLOW VOLTAGESEE NOTE
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1232Figure 11.1 Noncombustible Facing DiagramFire Risk. Finish all edges and fronts to clearance
33Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12C. Installation of Non-Combustible Facing MaterialsGypsum wallboard (drywall) joints adjacent
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/123412 12 Appliance Setup A. Remove Shipping MaterialsRemove shipping materials from inside or
35Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Stone Placement: Soho24B D. Positioning StonesFor proper performance and safety, it is critic
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1236Step 6. Spread the stones out evenly. Double check that there is only one layer of stones o
37Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Figure 12.10 Glass AssemblyRemoving Glass AssemblyPull the two glass assembly latches out of
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1238A. Before Lighting Appliance13 13 Operating Instructions CAUTIONIf installing IntelliFire
39Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12B. Lighting Instructions (IPI)The IPI system may be operated with two D-cell batteries. Whe
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/124ModelsU.S. (0-2000 ft.) or Canada (2000-4500 ft.)MaximumInput BTU/hMinimumInput BTU/hOrifi ce S
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1240Initial Break-in ProcedureWhen you light the appliance, you may notice that it pro-duces heat
41Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Sympton Possible Cause Corrective Action1. The ignitor/module makes noise, but no spark.a. In
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1242IntelliFire Ignition System - (continued)Symptom Possible Cause Corrective Action3. Continued
43Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1215 15 Maintaining and Servicing Appliance Although the frequency of appliance servicing and
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1244Inspect Maintenance TasksDoors, Surrounds and Fronts1. Assess condition of screen and replace
45Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Location Inches Millimeter Location Inches MillimeterA 29-1/8 740 J 11-1/2 292B 25-9/32 643 K
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1246Figure 16.1 SLP Series Vent ComponentsSL Series ComponentsCOOL-ADDCap Shield11-5/8 in.(295 m
47Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Effective Height/LengthPipeinches mmSLP4 4 102SLP6 6 152SLP12 12 305SLP24 24 610SLP36 36 914S
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1248B. Vent Components Diagrams (continued)Figure 16.3 SLP Series Vent ComponentsASSEMBLYSL-2DV
49Heat & Glo • Soho24B • 2137-900 Rev. P • 8/121 in.(25 mm)14 in.(356 mm)3/8 in. (10 mm)1 in. (25 mm)7-1/4 in.(184 mm)7-3/4 to 10-3/8 in.(19
5Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12H. Requirements for the Commonwealth of MassachusettsFor all side wall horizontally vented gas
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1250SOHO24BC. Service PartsBeginning Manufacturing Date: Aug. 2007Ending Manufacturing Date: ____
51Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12SOHO24BBeginning Manufacturing Date: Aug. 2007Ending Manufacturing Date: ______ Service Parts
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1252SOHO24BService PartsIMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacem
53Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12D. Limited Lifetime Warranty4021-645C 12-29-10 Page 1 of 2Hearth & Home Technologies In
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/1254D. Limited Lifetime Warranty (continued)4021-645C 12-29-10 Page 2 of 2WARRANTY CONDITIONS:
55Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12Heat & Glo, a brand of Hearth & Home Technologies Inc. 7571 215th Street West, Lakevi
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/126A. Design and Installation ConsiderationsHeat & Glo direct vent gas appliances are design
7Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12BCAA1/2 IN.ALCOVEINSTALLATIONTOP VENT,ONE 90º ELBOWBDEFigure 3.1 Appliance LocationsABCDEInch
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/128Figure 3.2 Clearances to CombustiblesCLEARANCES TO COMBUSTIBLES:ABCDE F G H I JKRough Openi
9Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12A. Vent Termination Minimum ClearancesFire Risk.Explosion Risk.Maintain vent clearance to com
Kommentare zu diesen Handbüchern